[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[commit-cp] [bugs #10546] Calendar/getMinimalDaysInFirstWeek() problem f
From: |
David Gilbert |
Subject: |
[commit-cp] [bugs #10546] Calendar/getMinimalDaysInFirstWeek() problem for some locales |
Date: |
Fri, 01 Oct 2004 09:38:31 -0400 |
User-agent: |
Mozilla/5.0 (X11; U; Linux i686; en-US; rv:1.6) Gecko/20040114 Epiphany/1.0.7 |
This mail is an automated notification from the bugs tracker
of the project: classpath.
/**************************************************************************/
[bugs #10546] Full Item Snapshot:
URL: <http://savannah.gnu.org/bugs/?func=detailitem&item_id=10546>
Project: classpath
Submitted by: David Gilbert
On: Fri 10/01/2004 at 13:31
Category: None
Severity: 5 - Average
Resolution: None
Privacy: Public
Assigned to: None
Status: Open
Platform Version: None
Summary: Calendar/getMinimalDaysInFirstWeek() problem for some locales
Original Submission: I noticed a problem while running some unit tests in my
project (JFreeChart) against Sun's (just released) JDK 1.5. It turns out that
my unit tests were flawed, the results depending on a bug in the JDK (bug
parade 4960125) that has now been fixed. I was interested to see what results
Classpath gives, so put together a Mauve test which shows that Classpath
returns the same (wrong) results as JDK 1.4, at least for Locale.UK and
Locale.FRANCE. I'll attach the Mauve test right after I submit this bug report
(so I can put the bug id number into the test for cross-referencing).
For detailed info, follow this link:
<http://savannah.gnu.org/bugs/?func=detailitem&item_id=10546>
_______________________________________________
Message sent via/by Savannah
http://savannah.gnu.org/
- [commit-cp] [bugs #10546] Calendar/getMinimalDaysInFirstWeek() problem for some locales,
David Gilbert <=