I have following flowgraph:
usrp_source--->>probe_mag_squared_block---->block2--->block3
What I want to do is that I want to bypass the "work" function of block2 when the threshold level of probe_mag_squared reaches. I do not want to stop(), lock(), disconnect the flow graph. Is this possible using stream tags, or message passing etc ? Any example code would be nice.
--