[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[Guile-commits] Hydra job gnu:guile-2-0:build_gcc3 build 1214603: Succes
From: |
Hydra Build Daemon |
Subject: |
[Guile-commits] Hydra job gnu:guile-2-0:build_gcc3 build 1214603: Success |
Date: |
Thu, 4 Aug 2011 20:03:37 +0200 |
Hi,
This is to let you know that Hydra build 1214603 of job
gnu:guile-2-0:build_gcc3 has changed from 'Failed' to 'Success'.
Complete build information can be found on this page:
http://hydra.nixos.org/build/1214603
A summary of the build information follows:
Build ID: | 1214603
Nix name: | guile-2.0.2.39-335c8
Short description: | Native Nix build on x86_64-linux
Maintainer(s): | address@hidden
System: | x86_64-linux
Derivation store path: |
/nix/store/ycvcn3giilcvsvw9xg4ap6b6k6ybablw-guile-2.0.2.39-335c8.drv
Output store path: |
/nix/store/6npis88nl7j2whg3ryr950619v83qcw7-guile-2.0.2.39-335c8
Time added: | 2011-08-04 20:03:37
Build started: | 2011-08-04 19:49:01
Build finished: | 2011-08-04 20:03:37
Duration: | 876s
The build inputs were:
Name | Type | Value
------------+-------+-------------------------------------------------------------
hydraConfig | svn |
https://svn.nixos.org/repos/nix/hydra-config/gnu/trunk:27734
nixpkgs | svn | https://svn.nixos.org/repos/nix/nixpkgs/trunk:28158
tarball | build | 1214558
Regards,
The Hydra build daemon.
[Prev in Thread] |
Current Thread |
[Next in Thread] |
- [Guile-commits] Hydra job gnu:guile-2-0:build_gcc3 build 1214603: Success,
Hydra Build Daemon <=