|
From: | François Galea |
Subject: | Re: [Help-glpk] Stop B&B at first feasible solution |
Date: | Tue, 07 Aug 2007 11:49:23 +0200 |
User-agent: | IceDove 1.5.0.10 (X11/20070329) |
Andrew Makhorin a écrit :
I would like to know if there a possibility to make GLPK stop as soon as a feasible solution is found.It is possible only on api level.
I was indeed looking for a solution on API level.Do you mean I nedd to use the new callback mechanism ? I thought there would be a way such as setting a control parameter (using lpx_set_int_parm). I haven't found any in the documentation.
Can you tell me how to do this ? Thanks François
[Prev in Thread] | Current Thread | [Next in Thread] |