Hi Bill,
Yes these are the kind of questions that are close to my heart too.
I found that Fogel's book, while very good, didn't outline much
about 'release' strategies with CVS, and in any case Open Source
strategies can have different priorities than commercial software
companies. I've set up a basic release strategy at my current
company - though I know the real test of it is going to happen when
we formally FCS and then have multiple lines of maintenance/patch
development along with the next revision development.
Hope the 'essay' is useful!
Cheers,
Teala
-----------------------------------------------------------------------
We use a 'build level' approach to development.
The basic process we are using is as follows:
- Nightly builds involve using cvs rtag to tag the module with a
descriptive bl_projectDate_time tag:
bl5_project14Aug01_0000
- The Build team has control of CVS tag name space and branching.
- Part of the reason we always do formal builds pulled from a tag
is that we use the $Name$ keyword in ident commands to allow for
identification of key binaries.
*Gotcha*: using $Name$ means that cvs will experience 'merge
conflicts' on doing updates in any working copies pulled from
a tag - so your source tree was pulled from a
bl5_project14Aug01_0000 tag, and then you run a build -
get a failure and try to go do a "cvs up -A" in your build tree
to get freshly delta's fixes, you will get merge conflicts on
all files that have the $Name keyword. Requires manual clean up.
- When one of those nightly builds (or requested build during the
day)is deemed to pass acceptance criteria and enters QA, it is
retagged with a formal build level tag, i.e.
PROJECT_BL5
- There is a short period during the integration cycle trying to
clear QA acceptance criteria, where we 'close the tree' on an
honor basis to new development, (i.e.until we know we have
reached a point that is sane enough to create a fixes branch).
- A quick diff -r is done against a pull of the official PROJECT_BL
tag against the build tree that produced the CD release to QA,
to ensure the correct files got the final tag.
- Archival of the old build level happens, which includes removing
any old unneeded'nightly' tags - to keep the cvs 'log' output
more manageable.
- At this point, the main trunk moves on for next build level
development
- If fixes are required for QA to complete their testing of say,
PROJECT_BL5, then I start a PROJECT_BL5-fixes branch rooted off
the PROJECT_BL5 tag
- Within our company, developers are required to double-delta
changeson the fixes branch to the main trunk as well. For
simplistic changes they have been able to use the
cvs up -jPROJECT-BL5-fixes command, or the
cvs up -j"one day ago" -jPROJECT-BL5-fixes command, to do
merges off the fixes branch. But some developers have had
problems with the merges loosing changes. We don't do
wholesale merges of the whole module off of a fixes branch back
onto the main trunk. This hasn't been a major issue here, as
often developers don't want the exact same fix in a maintenance
branch going into the top of tree code.
- Fixes branch builds are likewise rtagged before the source pull
to do the build, a minor number is rev'd to indicate how many
fixes 'rebuilds' have been done.... i.e.
PROJECT-BL5-2
- All the above tagging is automated in nightly build scripts that
do everything from the rtag, pull the src,kick off builds & unit
test passes across multiple OS platforms, run packaging on binary
outputs, create the CD's and post results.
- Occasionally I hand tag a few files and update them using -F flag
to a given PROJECT-BL tag when there is a small local rebuild
to correct a minor problem. In general I try to have any kind
of delivered release roll out of a full automated build.
- Top of tree (i.e. ongoing development) builds are run at night
via a cronjob. The fixes branch builds, and the
'integration cycle' builds just before a cut goes to QA,
involve coordination between developers and myself (build
engineer). This usually involves developers stomping into my
office exclaiming "we need another build" :-) Alternatively
it involves me stomping into their office exclaiming, "Is that
fix done yet, we need to start the build!" :-))
Or it might come from our program manger after a change
control meeting....
Unlike James Youngman's environment, I do not examine actual
delta's. I am more of an automation, release process and
packaging engineer than an engineer code-reviewing changes.
I think this is entirely a cultural/job definition issue within
your working environment.
- I anticipate that when we FCS - our maintenance releases will be
handled like our current BL-fixes branches. I don't know yet if
our subsequent projects will be new modules in the CVS tree,
stay on the main trunk, or move to a new repository.
Side tools that support the release process:
- We use cvsweb to make the tree available for graphical diff'ing
- We use perl scripts to provide web pages that display all
CVS changes that have gone into any particular day's build-
this parses cvs log outputto display a chart with the file
name (linked back into the cvsweb tree), revisions delta'd,
and the commit comments (which for us have a Bugzilla Bug ID)
There are scripts to provide some level of linking between
CVS and Bugzilla, which QA and I intend to install soon.
- *Gotcha* There are bugs in 'cvs log' that have resulted in
incorrect log outputfor changes between tags on branches in
our tree (especially files that have been removed from the tree
show up as having changed on the branch). I have had some good
emails with David Taylor about this and gotten some workarounds-
so I can at least display similar change logs between tags on
our fixes branch builds.
- When we are in change control and fixes need to be approved for
either main trunk or branch commits - we count on the 'honor
system'. BugID's from the comment logs in the daily top of tree
builds, or branch fix builds are confirmed against the approved
list by Build team or QA.
- We don't use the edit/unedit capacity here. Some developers use
watches to keep an eye on critical shared files.
- Occasionally, if there really is a need to lock an individual
file we use cvs admin -Ll <ver> filename.c
- I have once locked the whole tree with cvslock, when the src tree
was to be frozen, in a display of authority :-)
Some Things that developers tend to forget/not use correctly:
- When they go back and forth between trees that have sticky tags,
i.e. a tree pulled on a given tag (to reproduce a problem) or a
branch (to work on a fix), they claim update doesn't work, they
can't find top of tree files they know have been checked in.
Or they can't commit a change.
Answer: cvs up -A (or if you are in a branch you have to do
cvs up -r "Branch")!
- They do a cvs log in a branch working copy and see head
information at the top and think they aren't in a correct
branch copy. Answer: cvs status will show the sticky tag for
the branch more clearly
- Some developers get excited about cvs up -A and code it into
local utilities, then they go work on branch working copy, run
their magic update command and voila their changes show up in
top of tree instead!
Things not to try:
- Don't try and raise the revision across the whole module as part
of a release process It is confusing - new files won't
automatically go in at the higher version. Stick to tags.
- Don't run scripts that execute lots of cvs commands one after the
other - inetd locks up the port.