=================== BUG #1547: LATEST MODIFICATIONS ==================
http://savannah.gnu.org/bugs/?func=detailbug&bug_id=1547&group_id=509
Changes by: Dave Hall <address@hidden>
Date: 2002-Nov-23 19:52 (Australia/Melbourne)
What | Removed | Added
---------------------------------------------------------------------------
Assigned to | ralfbecker | skeeter
=================== BUG #1547: FULL BUG SNAPSHOT ===================
Submitted by: sewen Project: phpGroupWare
Submitted on: 2002-Oct-30 03:05
Category: calendar Bug Group: 0.9.14 release
Severity: 5 - Major Priority: Normal
Resolution: None Assigned to: skeeter
Status: Open Component Version: TGZ
Platform Version: BSD Reproducibility: Every Time
Summary: Calendar showing two October 27ths
Original Submission: I'm not sure if this is related to Bug #1537, but my
October calendar shows two day 27, Sunday 27 and Monday 27. The calendar also
thinks the real date is shifted down one day. The displayed date is shifted
down one more day. I checked other months and they seem ok (no double days).
But, I also checked October 2003 and it has the same problem.
phpGroupWare is running on a new MacOSX XServer with the latest Apache, MySQL
and PHP (I also have the problem on a Compaq laptop running Mandrake 9.0).
Thanks.
Follow-up Comments
*******************
-------------------------------------------------------
Date: 2002-Nov-06 04:37 By: sewen
I installed (draged & dropped) the calendar folder from a new download. Still
have the problem.
Mac OSX 10.2
Apache 1.3.26
php 4.1.2
MySQL 3.23.39
Everything else seems to be working fine.
Note: see bug report 136
-------------------------------------------------------
Date: 2002-Nov-06 04:29 By: sewen
I installed (draged & dropped) the calendar folder from a new download. Still
have the problem.
Mac OSX 10.2
Apache 1.3.26
php 4.1.2
MySQL 3.23.39
Everything else seems to be working fine.
-------------------------------------------------------
Date: 2002-Nov-06 03:54 By: sewen
I saw a comment on the web about the problem being fixed by changing the first
day of the week to Sunday. It did fix the problem with the double day 27, but
I still have the problem where the program thinks it is one day in the future,
i.e. this is Tuesday November 5th, which shows up correctly on the Calendar,
but the Calendar keeps displaying Wednesday (Nov 6th).
I was going to update by downloading the latest version on the phpgroupware.org
web site. I don't know how to cvs? I don't see the command. The files for
phpGroupWare on the Macintosh XServer are in the following directory:
/Library/WebServer/Documents/phpgroupware/
Thanks.
Scott E.
-------------------------------------------------------
Date: 2002-Nov-06 00:42 By: ralfbecker
I can't reproduce that.
Can u please update your 0.9.14 from cvs and check if the prob still exist.
Please let me know and/or close the bug on savanah.
To update go to your phpgroupware-install-dir and type the following cvs
command: cvs update
Ralf
CC list is empty
No files currently attached
For detailed info, follow this link: