[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: gnulib-tool: Ensure that long-running tests are executed last
From: |
Jim Meyering |
Subject: |
Re: gnulib-tool: Ensure that long-running tests are executed last |
Date: |
Fri, 02 Apr 2010 20:47:26 +0200 |
Eric Blake wrote:
> On 04/02/2010 12:08 PM, Bruno Haible wrote:
>> This ensures that long-running tests are executed last. So that the user
>> gets the maximum of information as quickly as possible.
>
> That goes counter to the idea of parallel execution, where you want the
> long-running tests front-loaded so that the shorter tests can fill in
> the gaps. If the long-running tests are last, then the entire parallel
> operation is stuck waiting for the last test. Is there any way this can
> be made conditional, because there are good arguments for both orderings?
Seconded.
I have deliberately reordered some tests to put long-running
ones early enough so that a parallel (often -j5 or more) build
completes as quickly as possible.