[Top][All Lists]
[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[O] Drawers within inline tasks
From: |
Viktor Rosenfeld |
Subject: |
[O] Drawers within inline tasks |
Date: |
Fri, 27 Jan 2012 23:46:53 +0100 |
User-agent: |
Mutt/1.5.21 (2010-09-15) |
Hi everybody,
I recently discovered inline tasks and use them to keep todos that are
related to a text I write close to the text. I'm not a big fan of their
visibility behavior, but I think I can manage.
I would very much like to clock work on inline tasks. However, when
opening a tasks with inline tasks the LOGBOOK drawer is opened as well
producing a lot of clutter. The same is true for the PROPERTIES drawer
containing the effort estimate. Is it possible to keep drawers below an
inline task collapsed?
Ideally I would like to be able to configure the visibility behavior of
inline tasks. I think I would prefer them to behave just like normal
tasks.
Thanks,
Viktor
- [O] Drawers within inline tasks,
Viktor Rosenfeld <=