[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[O] Putting a todo item to the end of this level
From: |
Uwe Ziegenhagen |
Subject: |
[O] Putting a todo item to the end of this level |
Date: |
Sun, 12 Oct 2014 07:37:06 +0000 (UTC) |
User-agent: |
Loom/3.14 (http://gmane.org/) |
Hello,
how can I move a specific TODO item to the end of the level it currently sits?
Example
a) before the command was executed
* TODO Level 1
** TODO something to do a
** DONE something to do b
** TODO something to do c
** TODO something to do d
* TODO Level 1 again
b) after the command was executed (TODO is moved to the end of the TODO
Level 1 items)
* TODO Level 1
** TODO something to do a
** TODO something to do c
** TODO something to do d
** DONE something to do b
* TODO Level 1 again
Thanks a lot in advance,
Uwe
- [O] Putting a todo item to the end of this level,
Uwe Ziegenhagen <=