[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[O] Bug: Marking repeated tasks with two tags as DONE causes problems
From: |
Josh Moller-Mara |
Subject: |
[O] Bug: Marking repeated tasks with two tags as DONE causes problems |
Date: |
Fri, 11 Aug 2017 15:04:05 +0800 |
Hello,
I'm starting to encounter a strange, silent problem when switching the
state of a task with multiple tags. With the following minimal example:
#+STARTUP: logdone
#+STARTUP: logdrawer
* TODO Hello :hi:there:
SCHEDULED: <2017-08-11 Fri .+1d>
Switching The "hello" task from "TODO" to "DONE" should keep the task as
"TODO", but schedule it in the future. Instead, the file ends up looking
like:
#STARTUP: logdone :hi:there:
#+STARTUP: logdrawer
* DONE Hello :hi:there:
CLOSED: [2017-08-11 Fri 14:57] SCHEDULED: <2017-08-12 Sat .+1d>
Where the task is marked as "DONE", and weirdly tags are added in some
of the startup config at the beginning of the file.
I'm using
Emacs : GNU Emacs 26.0.50.2 (x86_64-pc-linux-gnu, GTK+ Version 3.22.5)
of 2017-01-18
Package: Org mode version 9.0.9 (release_9.0.9-746-g8fa6c0 @
/usr/local/share/emacs/site-lisp/org/)
There still seems to be a problem with org-toggle-tag, which is causing
this. I think it has to do with the "replace-match"
again. "org-split-string" doesn't save match data, so "replace-match"
replaces the wrong thing.
Best,
Josh
- [O] Bug: Marking repeated tasks with two tags as DONE causes problems,
Josh Moller-Mara <=