i already solve a problem with glpk, but i want to validate it with calculate the objective function in excel
but i have the different value between objective function in glpk and excel.
glpk's objective function was 1805582104 , but if i calculate it with excel it was 1838084829
hereby i attached my
problem, thanks in advance
warm regards
Ajeng Dewi Citra LangeniIndustrial Engineering
Bandung Institute of Technology