From: | durga bhavani |
Subject: | Re: [Swarm-Support] Java Swarm With Graphs |
Date: | Mon, 14 Nov 2005 19:50:44 -0800 (PST) |
A time series graph tool.. A time series graph tool, based on BLT's graph widget. Graph currently implements just a basic graph with multiple datasets, but should eventually support scaling and scrolling. For each Graph you create one or many GraphElements, one per dataset to plot. GraphElements can be configured for appearance, and data can be added to the element to draw.
Thanks
Durga
Hello SteveNo I need to add 100 curves each in different time steps.Thanks a lotDurga
Steve Railsback <address@hidden> wrote:durga bhavani wrote:
> Hello
>
> I am trying to generate a graph and in my program each iteration
> generates 4 values
> and i am running it for 100 iterations so altogether I get 400 values
> I need to draw iteration veruse values graph but i don't want to remove
> the periovs iterations values so my graph should get all 100 arcs.
> Is this thing possible in Java
> could some one please give me an example And the other doubt i have is
> can I pass array as an argument to graph
Do you mean you just want to plot 4 curves, each of which shows the
value of one variable over the iterations? If so, a standard EZGraph
should do what you want. On each tick it simply adds a new value to a
line graph...or new values to several lines. Add 4 curves to the graph
by using the "createSequence$withFeedFrom$andSelector" method four times.
Steve R.
--
Lang Railsback & Assoc.
250 California Ave.
Arcata, California 95521
(707) 822-0453
_______________________________________________
Support mailing list
address@hidden
http://www.swarm.org/mailman/listinfo/support__________________________________________________
Do You Yahoo!?
Tired of spam? Yahoo! Mail has the best spam protection around
http://mail.yahoo.com _______________________________________________
Support mailing list
address@hidden
http://www.swarm.org/mailman/listinfo/support
[Prev in Thread] | Current Thread | [Next in Thread] |