I asked on #gnash about the current status and what need to be fixed
before a new release can be made, and was told by gg0 that there is
one security issue and one blocking bug holding back the next release:
#40315 tummy_trouble.swf segfaults
<URL: http://sv.gnu.org/bugs/?40315 >
#39989 Assertion `(_shape1.subshapes().size() ==
_shape2.subshapes().size()) && (_shape2.subshapes().size() ==
1)' failed.
<URL: http://sv.gnu.org/bugs/?39989 >
Both was introduced after the last release, if I understand the bug
reports. As far as I can tell, neither of these bugs are detected by
'make check' at the moment, making me suspect that a good start would
be to add a testsuite check for these problems.
There is also 13 bugs with severity important that would be nice to
have fixed before a new release is made:
<URL:
https://savannah.gnu.org/bugs/index.php?go_report=Apply&group=gnash&func=browse&set=custom&msort=0&report_id=101&advsrch=0&status_id=1&resolution_id=0&submitted_by=0&assigned_to=0&category_id=0&severity=7&summary=&details=&sumORdet=0&history_search=0&history_field=0&history_event=modified&history_date_dayfd=8&history_date_monthfd=1&history_date_yearfd=2014&chunksz=50&spamscore=5&boxoptionwanted=1#options
>.
Are there other problems holding back the release?
--
Happy hacking
Petter Reinholdtsen
- [Gnash-dev] What is left do to o before a new release can be made?,
Petter Reinholdtsen <=
- Re: [Gnash-dev] What is left do to o before a new release can be made?, Petter Reinholdtsen, 2014/01/10
- [Gnash-dev] Revert the subshape change until regressions are fixed? (Was: What is left do to o before a new release can be made?), Petter Reinholdtsen, 2014/01/16
- Re: [Gnash-dev] Revert the subshape change until regressions are fixed?, Petter Reinholdtsen, 2014/01/16
- Re: [Gnash-dev] Revert the subshape change until regressions are fixed? (Was: What is left do to o before a new release can be made?), Bastiaan Jacques, 2014/01/16
- Re: [Gnash-dev] Revert the subshape change until regressions are fixed? (Was: What is left do to o before a new release can be made?), Petter Reinholdtsen, 2014/01/16
- Re: [Gnash-dev] Revert the subshape change until regressions are fixed? (Was: What is left do to o before a new release can be made?), Rob Savoye, 2014/01/16
- Re: [Gnash-dev] Revert the subshape change until regressions are fixed? (Was: What is left do to o before a new release can be made?), Sandro Santilli, 2014/01/16
Re: [Gnash-dev] What is left do to o before a new release can be made?, Rob Savoye, 2014/01/14